Illustrative concept image of an organised network rack with patch panels and structured cabling

ONE TOUCH AUTOMATION & ELV · CONNECTIVITY · MUMBAI

Networking & Structured Cabling

A considered connectivity foundation for the rooms, devices and building systems that rely on your network.

BUILDING TECHNOLOGY · ELV · AUTOMATIONONE TOUCH. EVERYTHING CONNECTED.

A CONSIDERED APPROACH

Connectivity starts with a well-planned foundation.

One Touch helps plan structured cabling, network infrastructure and related IT requirements around a property’s layout and connectivity needs. Site conditions, cable routes, data points, equipment locations, wireless coverage and connected systems are considered together. Mobile signal booster suitability depends on measured signal conditions, provider coverage, equipment and applicable requirements. Equipment selection, capacity and integration are confirmed for each project.

Final scope, system selection and delivery arrangements are confirmed for each project.

WHAT WE CAN HELP WITH

Solutions shaped
around your site.

We start with your building, its people and the way the space needs to work.

01

Structured LAN cabling

Plan Cat6 or Cat6A cabling, LAN points and patch panels around room use and network requirements. Cable routes, terminations and cable management are considered with the building layout and site conditions.

02

Fibre-optic networking

Consider fibre links for network backbones, inter-floor connectivity or links between buildings. Route planning, fibre type, termination points and compatible network interfaces depend on the site and equipment selected.

03

Wi-Fi and wireless infrastructure

Plan access point locations and wireless coverage across rooms and floors, considering building materials, layout and expected use. Coverage needs should be assessed for the specific property and device density.

04

Network racks and equipment

Plan suitable locations and organisation for network racks, switches, routers and patch panels. Equipment access, cable management and the connections between rack equipment and building areas are considered in the scope.

05

CCTV and security networking

Include network connections for selected IP cameras, NVRs, video door phones, access control and other connected security systems. Port, bandwidth and power requirements depend on the chosen equipment and system design.

06

Residential and commercial networking

Scope network infrastructure for homes, offices, housing societies, hotels and commercial properties, from connection points and Wi-Fi needs to shared equipment locations and building links.

07

Mobile signal booster assessment

Review indoor mobile coverage and discuss whether a signal booster may be suitable. Feasibility and any installation requirements depend on measured signal, carrier conditions, the building and applicable rules. No coverage improvement can be confirmed before assessment.

08

IT infrastructure and products

Discuss network-related IT products and infrastructure needs such as connectivity equipment and supporting components. Product selection, availability and any setup scope are confirmed against the project requirements.

WHERE IT FITS

Applications
across sectors.

The right scope depends on the property, operating needs and spaces being served.

  • 01Private residences and multi-room homes
  • 02Apartment buildings and residential towers
  • 03Housing societies and common facilities
  • 04Offices and meeting spaces
  • 05Retail spaces and customer areas
  • 06Hotels and hospitality properties
  • 07Commercial buildings and workplaces
  • 08Multi-floor developments and building campuses

THE ONE TOUCH APPROACH

Thoughtful planning.
Clear coordination.

We help make complex building systems easier to plan, install and use.

01

Site assessment considers layout, existing infrastructure and connectivity needs

02

A network layout identifies data points, equipment locations and building links

03

Cable routes are considered alongside construction, access and other building services

04

Equipment locations are planned for the network functions and connections required

05

Capacity is discussed against current equipment and intended future expansion

06

Installation approach and handover needs are defined for the agreed project scope

HOW WE WORK

From first conversation
to considered handover.

The sequence is tailored to the service and project scope, with decisions confirmed as the site requirements become clear.

  1. 01

    Consultation

    Understand priorities, users and intended outcomes.

  2. 02

    Site assessment

    Review the property, existing systems and site conditions.

  3. 03

    System design

    Shape a practical scope around the requirements.

  4. 04

    Equipment selection

    Confirm suitable equipment for the agreed scope.

  5. 05

    Installation

    Coordinate installation with the site and other works.

  6. 06

    Integration

    Coordinate system interfaces where suitable and compatible.

  7. 07

    Testing & handover

    Review operation and hand over the agreed system.

Maintenance and support arrangements can be discussed where relevant to the service and project scope.

COMMON QUESTIONS

Good to know
before we begin.

What is the difference between Cat6 and Cat6A cabling?

Cat6 and Cat6A have different transmission performance characteristics and installation considerations. The appropriate option depends on the planned network, connected equipment, cable route, environment and future requirements; it should be selected for the specific project.

Can fibre connect different floors or separate buildings?

Fibre can be considered for building backbones, inter-floor links and connections between buildings. Feasibility depends on route availability, distance, termination locations and compatible network equipment.

How is Wi-Fi coverage planned?

Planning considers floor plans, wall and floor materials, likely device locations, user density and areas needing service. Access point locations and coverage requirements are assessed for the site; actual performance depends on the installed equipment and environment.

Can an existing network be extended?

Existing cabling, rack space, equipment, available ports and cable routes can be reviewed first. The practical options depend on the condition and compatibility of the current infrastructure.

What networking is needed for IP CCTV?

IP cameras and recorders need suitable network connections. Port capacity, traffic, power requirements and the network layout depend on the number and type of selected devices and recording arrangement.

When should cabling be planned during construction or renovation?

Early planning helps identify cable routes, conduits, LAN points, rack locations and links between floors before finishes are closed. Plans should be coordinated with the building layout and other site services.

Can a mobile signal booster improve indoor coverage?

A booster may be considered after reviewing indoor and outdoor signal conditions, carrier coverage, the property and applicable requirements. Suitability and expected results cannot be confirmed without assessment.

Can you help with IT products as well as cabling?

Network-related IT product requirements can be discussed alongside infrastructure planning. Availability, selection and any configuration scope depend on the project and confirmed requirements.

LET’S TALK ABOUT YOUR SITE

Start with a
conversation.

Share your requirements and location. We’ll help you outline the next step.

☏Ask about this service